SESSION #18 - THE TYCHO EVENT
Wednesday, August 7th.. Tuesday, August 6, 6:00 PM: Preparation. The weather looked "iffy" but the National Weather Service
was projecting clear skies for the evening and following morning, with
possible scattered thundershowers by Wednesday afternoon. We contacted
Jeff Lyons of WFIE TV14. He gave us the all clear, but said skies would
be a little hazy.
We hauled out the 16" scope, attached the primary mirror,
and used the Laser Colimator to align the optics. The Scope Transport
Unit had been completed on the weekend (after many delays over seven
months) and the scope was locked in place. There was nothing to align
on. Distant ground targets were blanked out by corn fields. The moon
was due up after midnight, then still behind the tall trees in the east.
We checked the Coordinated Universal Time and at 10:30 PM set all our digital clocks to CUT, including the pc's internal clock. A fresh tape was placed in the VCR and the two betamax units were rewound and zeroed. This session utilized a Recoton dubbing enhancer to boost the image from the main CCD camera. After the signal passed through 50' of RG59/U to the Sanyo Betamax 6800, it was put through a Archer Amplified A/V switch panel and fed into the dubbing enhancer, then to the VCR. Richard Motzer of Scottsdale, Arizona, advised us to
eliminate the dubber and is sending us an Aperture Video Corrector
Circuit for future sessions scheduled for late August or early
September.
We planned this session from 6:00 PM on Tuesday and stayed
up until 4:00 AM the following morning. The only problem we had was in
the RG59/U cable connectors. The male "F" connectors on the ends of
these 50-foot coax cables (same as used for normal video home hook-ups)
are very vulnerable, especially if they are unscrewed very often. We
had considerable difficulty troubleshooting the LOS (loss of signal)
from the main camera. We use four of these 50-foot cables, two black
and two white. Each has an outgoing and a return line. That way the
tracking camera (black line) and scanning camera (white line) have
signals going into the facility and back to monitors at the scope site.
By playing back a pre-recorded session on the recorders, the return
lines checked out OK. There was picture of the small moon on one
monitor and a close-up on the other. The problem HAD to be on the
"live" incoming main line. It turned out that the "F" connector was
loose and had actually pulled off. This happened two times before out
of four cables! We later replaced these with heavy duty ones wedged on
by a special tool. Then, since the male RCA connectors from the cameras
have to be plugged into these, use female "F' connector-to-femaIe RCA
adaptors to connect, rather than unscrew. By doing this you keep
pressure on the connectors and help keep them from becoming loose.
We also eliminated the need for two monitors on the scope site by putting a video cable AB switch at the end of the two return lines, then running the single short video line to the monitor. By switching from "A" to "B" we had the live VLPS (Very Low Power Scan) images from the tracking camera, or the HPS (High Power Scan) live images from the scanning camera. Keep in mind, this is for on-site observation and taping where we tape everything in the facility but enjoy the fresh air and cool clear nights outdoors. In-door observations only utilize the outside monitor for alignment and focus. The Tycho event, if originally caused by lighting
conditions, should have repeated the 1992 event witnessed by ALPO's
David 0. Darling. We were watching for illumination inside the crater
shadow-filled area. The central peak had become nebulous in appearance
and there were streamers reported in the 1992 event.
The colongitude calculations predicted very similar lighting
conditions for this morning at 8H39M CUT, which was 2:39 AM here in SW
Indiana. The Moon had appeared on the horizon right after midnight, but
too low to observe because of the obstruction of some trees. Once
noticed, however, the STU was moved to a better vantage point and
alignment and focussing began. As stated earlier, there was trouble
with the main signal. Sometimes it came in, other times not, and very
unstable. By the time the event was supposed to be nearing, the image
was lost. Frantically we worked, and panic & loss of sleep was
starting to have its effect. Then the bad "F1 connector was discovered
and corrected, at least most of the time. The problem then became in
the keeping of the lunar highlands, and the Tycho area in particular,
in the field of view. We we not prepared for thr "track" mode and had
to use the "pan" mode and scan across the lunar surface as we always
did. For this event we should have been prepared to "track", but we
didn't get our "dress-rehearsal" in time.
Lunar range: 244,796 miles, 102.4872% of mean
Review of the data tapes shows that most of the images, including the
lunar limb, were blurred due to atmospheric haze. No anomales reported.Age: 22.8 days of its 29.53 day cycle Phase: 38.2% waning EOS 18
|